Conventus pliers ad productionem qualified partibus secundum ecclesiam drawings ad rectam processum de conventu, praevia committendo.
By mechanical engineers, electrical engineers, mechanical parts and electrical parts of the inspection, for the design error to make corresponding adjustments, inspection is completed by the equipment commissioning personnel on the equipment for the initial test run, each part of the corresponding adjustments, until the production of qualified products, and finally equipment testing of various indicators, such as durability, stability, failure rate, noise, delay, interference and so on.
Amplio in apparatu notitia, manual, sustentationem manual, electrica, mechanica drawings, ad commodum de customers postea usus.